List every assignment with its due date and how long you think it will take. The planner works backwards to tell you when to start.
Plan backwards from the due date
The planner estimates how many days each assignment needs from your time estimate (about two focused hours a day) and adds a buffer day. The result is a “start by” date. Start on that date and you finish with time to spare, instead of writing the night before.
Making estimates realistic
- Most tasks take about 1.5× longer than planned, so pad your estimates.
- Break anything over six hours into smaller steps (research, outline, draft, edit).
- Review the list every Sunday and adjust start dates.
Example
A 2,000-word research paper due on the 20th, estimated at 12 hours, needs about 6 working days at two hours a day plus one buffer day, so the planner sets a start date of the 13th. Starting on the 13th means the final edit happens on the 19th instead of at midnight on the 20th.
Tips
- Estimate generously — most tasks take about 1.5× longer than planned.
- Break projects over 6 hours into smaller assignments.
- Click the circle to move items from to do → in progress → done.
Frequently asked questions
How is the “start by” date calculated?
It assumes about two focused hours per day on the task, plus one buffer day before the deadline.
Is my planner saved?
Yes, on this device in your browser’s storage. Export a backup if you switch devices.
Can I import assignments from Canvas?
Not automatically in this version. You can add them in a few seconds each, or copy them from your Canvas calendar.